Photo matches marked “Probable” were inferred from capture order and require confirmation. Items without a matched photo remain listed. Status reflects the current owner’s register.
A9340-057 · Unit 101 Cabinets · Open
Repair damage at sink cabinet base. Sink cabinet / base
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P057 · Probable — review A9340-058 · Unit 101 Doors · Open
Adjust sliding door so it clears obstruction and latches. Sliding door
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
No clear photo identified in supplied album. Item retained from source notes.
No matched photo
A9340-059 · Unit 101 Flooring · Open
Install missing flooring at north wall. Bedroom / north wall
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Lower confidence: confirm unit and item; visual detail is ambiguous or nearby items compete for this photo.
P058 · Probable — review A9340-060 · Unit 101 Flooring · Needs clarification
Confirm flooring defect by tub and correct. Tub
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P059 · Probable — review A9340-061 · Unit 101 Fire protection · Open
Install missing sprinkler escutcheon. Bathroom sprinkler
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: High
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P060 · Probable — review A9340-062 · Unit 101 Paint · Open
Paint/touch up closet wall. Closet wall
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P061 · Probable — review A9340-063 · Unit 102 Paint · Needs clarification
Touch up paint at electrical panel; confirm wall versus panel finish. Electrical panel
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P062 · Probable — review A9340-064 · Unit 104 Cleaning · Open
Remove paint overspray from flooring. Bedroom / north wall
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P063 · Probable — review A9340-065 · Unit 104 Flooring · Needs clarification
Confirm flooring defect at north wall and correct. Other bedroom / north wall
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Lower confidence: confirm unit and item; visual detail is ambiguous or nearby items compete for this photo.
P064 · Probable — review A9340-066 · Unit 104 Plumbing · Needs clarification
Confirm whether tub seal gap requires correction. Tub seal
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
No clear photo identified in supplied album. Item retained from source notes.
No matched photo
A9340-001 · Unit 105 Flooring · Open
Close flooring gap below PTAC. PTAC / room unspecified
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P002 · Probable — review A9340-002 · Unit 105 Appliances · Open
Repair or replace dented dishwasher finish. Dishwasher
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P003 · Probable — review A9340-003 · Unit 105 Cabinets · Open
Adjust cabinet doors above microwave. Above microwave
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P004 · Probable — review A9340-004 · Unit 105 Flooring · Needs clarification
Correct flooring below bedroom PTAC; confirm specific defect. Bedroom / PTAC
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
No clear photo identified in supplied album. Item retained from source notes.
No matched photo
A9340-005 · Unit 107 Cabinets · Open
Adjust Lazy Susan to open fully. Lazy Susan
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P005 · Probable — review A9340-006 · Unit 107 Doors · Needs clarification
Repair crack at bathroom door latch area; confirm whether door or jamb is affected. Bathroom / latch area
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P006 · Probable — review A9340-007 · Unit 107 Doors · Open
Adjust laundry door to close properly. Laundry
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P007 · Probable — review A9340-008 · Unit 107 Paint · Open
Touch up paint in bedroom closet. Bedroom closet
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P008 · Probable — review A9340-009 · Unit 108 Paint · Open
Touch up paint beside bathroom door. Bathroom door / side
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Lower confidence: confirm unit and item; visual detail is ambiguous or nearby items compete for this photo.
P009 · Probable — review A9340-010 · Unit 108 Plumbing · Open
Replace toilet seat. Toilet
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P010 · Probable — review A9340-011 · Unit 108 Flooring · Open
Close flooring gap left of bedroom PTAC. Bedroom / left of PTAC
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P011 · Probable — review A9340-067 · Unit 109 Flooring · Open
Close flooring gap. Laundry
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P065 · Probable — review A9340-068 · Unit 109 Drywall · Open
Remove wall glob and restore finish. Right of tub
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P066 · Probable — review A9340-069 · Unit 109 Doors · Needs clarification
Inspect reported crack or seal issue and confirm correction. Left laundry door / seal
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P067 · Probable — review A9340-070 · Unit 109 Flooring · Needs clarification
Correct two flooring defects left of PTAC; confirm defect types. Bedroom / left of PTAC
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Lower confidence: confirm unit and item; visual detail is ambiguous or nearby items compete for this photo.
P068 · Probable — review P069 · Probable — review A9340-071 · Unit 109 Flooring · Needs clarification
Confirm flooring defect at corner and correct. Other bedroom / corner
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P070 · Probable — review A9340-072 · Unit 109 Drywall · Open
Repair wall ding and touch up paint. Closet
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P071 · Probable — review A9340-073 · Unit 109 Trim · Open
Close base gap at right side of kitchen cabinet. Kitchen cabinet / right side
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P072 · Probable — review A9340-074 · Unit 110 Cabinets · Open
Correct gap below cabinet at right side. Kitchen cabinet / lower right
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P073 · Probable — review A9340-075 · Unit 110 Paint · Open
Touch up paint at sliding door. Water heater closet sliding door
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P074 · Probable — review A9340-076 · Unit 110 Electrical · Needs clarification
Confirm required sealant/detail at power penetration and complete. Power penetration through wall
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Candidate photo shows wall penetrations in a closet. Confirm which is the power penetration and the applicable sealant detail.
P075 · Probable — review A9340-077 · Unit 111 Cabinets · Needs clarification
Review unusual dishwasher detail and confirm required correction. Dishwasher / typical detail
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P076 · Probable — review A9340-078 · Unit 111 Cabinets · Open
Close gap at cabinet bottom and secure scribe with appropriate finished fastening. Kitchen cabinet / lower right and scribe
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P077 · Probable — review A9340-079 · Unit 111 Doors · Open
Correct caulking at sliding door. Sliding door
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P078 · Probable — review A9340-080 · Unit 111 Plumbing · Needs clarification
Verify/install showerhead; candidate photo shows a bare shower arm with no showerhead. Bathroom showerhead
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P079 · Probable — review A9340-081 · Unit 112 Flooring · Open
Install missing flooring. Right of kitchen cabinet
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P080 · Probable — review A9340-082 · Unit 112 Drywall · Open
Clean up drywall finish around outlet. Bedroom outlet / left of PTAC
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P081 · Probable — review A9340-083 · Unit 112 Cleaning · Open
Remove paint overspray from flooring. Bedroom corner
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P082 · Probable — review A9340-084 · Unit 113 HVAC · Needs clarification
Investigate stain below PTAC for possible leak; source notes stain was dry. PTAC / flooring below
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: High
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P085 · Probable — review A9340-085 · Unit 113 Doors · Open
Install missing strike plates. Laundry doors
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P083 · Probable — review A9340-086 · Unit 113 Drywall · Open
Repair/touch up wall corner. Corner / right of tub
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P084 · Probable — review A9340-087 · Unit 114 Doors · Needs clarification
Install missing strike plate and other missing hardware; confirm full hardware scope. Left bedroom door
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
No defensible photo match identified. Nearby photos fit subsequent items more closely.
No matched photo
A9340-088 · Unit 114 Flooring · Needs clarification
Confirm flooring defect and correct. Left of sliding door
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
No defensible photo match identified. Nearby photos fit subsequent items more closely.
No matched photo
A9340-089 · Unit 114 Drywall · Open
Repair/touch up wall at outlet. West bedroom entrance / outlet
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Lower confidence: confirm unit and item; visual detail is ambiguous or nearby items compete for this photo.
P086 · Probable — review A9340-046 · Unit 201 Flooring · Open
Secure popping flooring right of bedroom PTAC. Bedroom corner / right of PTAC
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Lower confidence: confirm unit and item; visual detail is ambiguous or nearby items compete for this photo.
P046 · Probable — review A9340-047 · Unit 201 Flooring · Open
Close flooring gap right of toilet. Right of toilet
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Lower confidence: confirm unit and item; visual detail is ambiguous or nearby items compete for this photo.
P047 · Probable — review A9340-048 · Unit 201 Flooring · Open
Complete flooring replacement underway and verify finish. Other bedroom
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
No clear photo identified in supplied album. Item retained from source notes.
No matched photo
A9340-049 · Unit 202 Drywall · Open
Repair wall ding at sliding door and touch up paint. Sliding door
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P048 · Probable — review A9340-050 · Unit 202 Cabinets · Open
Correct caulk joint at trim right of upper cabinet. Trim / right of upper cabinet
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P049 · Probable — review A9340-051 · Unit 202 Paint · Open
Touch up paint at water heater door frame. Water heater door frame
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P050 · Probable — review A9340-052 · Unit 203 Flooring · Open
Secure popping flooring at sliding door. Sliding door
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P052 · Probable — review A9340-053 · Unit 203 Flooring · Open
Close flooring gap at base of south wall. Bedroom / south wall
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P053 · Probable — review A9340-054 · Unit 204 Cabinets · Open
Adjust cabinet door so it clears oven. Left of oven
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P055 · Probable — review A9340-055 · Unit 204 Cleaning · Needs clarification
Remove gypsum/construction splatter and restore wall finish; verify material. Bathroom entrance / left wall
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P054 · Probable — review A9340-056 · Unit 204 Flooring · Open
Close flooring gap at base of north wall. Bedroom / north wall
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P056 · Probable — review A9340-014 · Unit 205 Cabinets · Open
Adjust Lazy Susan to open properly. Lazy Susan
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P014 · Probable — review A9340-015 · Unit 205 Cabinets · Open
Adjust cabinet above microwave. Above microwave
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P015 · Probable — review A9340-016 · Unit 205 Cabinets · Open
Correct gap below cabinets at left side. Lower cabinets / left side
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P016 · Probable — review A9340-017 · Unit 205 Flooring · Open
Correct bubble in flooring below dishwasher. Below dishwasher
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P017 · Probable — review A9340-018 · Unit 205 Paint · Open
Remove wall marks or touch up above towel ring, towel bar, and shower curtain rod. Bathroom / above accessories
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P018 · Probable — review P019 · Probable — review P020 · Probable — review A9340-019 · Unit 205 Drywall · Open
Repair overcut around exhaust fan and restore finish. Bathroom exhaust fan
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P021 · Probable — review A9340-012 · Unit 206 Cabinets · Needs clarification
Confirm whether gap below dishwasher at left requires infill or trim. Dishwasher / lower left
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P012 · Probable — review A9340-013 · Unit 206 Windows · Open
Caulk sides of bedroom windows. Bedroom windows
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P013 · Probable — review A9340-020 · Unit 207 Fire protection · Needs clarification
Seat escutcheon cover snug to wall; verify system and location. Above TV wall
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: High
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P023 · Probable — review A9340-021 · Unit 207 Cleaning · Needs clarification
Clean area around outlet described as TV outlet in bathroom; confirm location. Bathroom / TV outlet
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P024 · Probable — review A9340-022 · Unit 207 Appliances · Open
Repair or replace scratched dishwasher finish. Dishwasher
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P025 · Probable — review A9340-115 · Unit 209 Flooring · Open
Close flooring gap. Sliding door
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P109 · Probable — review A9340-116 · Unit 209 Drywall · Open
Repair pinhole and touch up paint. Above fire alarm
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P110 · Probable — review A9340-117 · Unit 209 Doors · Open
Repair ding next to strike plate. Laundry / strike plate
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P111 · Probable — review A9340-112 · Unit 210 Cabinets · Open
Correct gap at floor below cabinet. Right of sink / cabinet base
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P106 · Probable — review A9340-113 · Unit 210 Flooring · Open
Secure popping flooring. Left of PTAC
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P107 · Probable — review A9340-114 · Unit 210 Cleaning · Open
Remove paint overspray. Left of bedroom door / living room side
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P108 · Probable — review A9340-109 · Unit 211 Cabinets · Open
Correct gap at upper cabinet. Upper above sink
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P103 · Probable — review A9340-110 · Unit 211 HVAC · Needs clarification
Remove tape from heater fan; confirm equipment location. Heater fan
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P104 · Probable — review A9340-111 · Unit 211 Plumbing · Needs clarification
Review tub-to-floor caulking and confirm correction. Tub / floor junction
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P105 · Probable — review A9340-101 · Unit 212 Flooring · Open
Secure popping flooring. Sliding door
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P096 · Probable — review A9340-102 · Unit 212 Cleaning · Open
Remove paint overspray. Refrigerator panel / bottom
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P097 · Probable — review A9340-103 · Unit 212 Trim · Open
Correct base caulking. Behind bathroom door
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P098 · Probable — review A9340-104 · Unit 212 Doors · Open
Install missing bedroom door. Bedroom
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
No clear photo identified in supplied album. Item retained from source notes.
No matched photo
A9340-105 · Unit 212 Cleaning · Open
Remove tape from latch. Laundry door latch / top
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
No defensible photo match identified. Nearby photos fit subsequent items more closely.
No matched photo
A9340-106 · Unit 212 Trim · Open
Correct base caulking. Right of kitchen cabinets
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Lower confidence: confirm unit and item; visual detail is ambiguous or nearby items compete for this photo.
P099 · Probable — review A9340-107 · Unit 212 Cabinets · Open
Correct gaps on both sides of upper cabinets. Uppers above sink / both sides
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P100 · Probable — review P101 · Probable — review A9340-108 · Unit 212 Drywall · Open
Clean up wall finish around outlet. Outlet / left of sink
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P102 · Probable — review A9340-094 · Unit 213 Cleaning · Open
Clean cover. Data/modem cover
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
No clear photo identified in supplied album. Item retained from source notes.
No matched photo
A9340-095 · Unit 213 Flooring · Open
Secure loose flooring at two locations. Sliding door / two locations
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P091 · Probable — review P092 · Probable — review A9340-096 · Unit 213 Doors · Open
Correct caulking at sliding door. Sliding door
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Lower confidence: confirm unit and item; visual detail is ambiguous or nearby items compete for this photo.
P091 · Probable — review P092 · Probable — review A9340-097 · Unit 213 Flooring · Needs clarification
Confirm flooring defect and correct. Corner / right of PTAC
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P093 · Probable — review A9340-098 · Unit 213 Doors · Open
Secure loose door handle/hardware. West bedroom handle
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
No clear photo identified in supplied album. Item retained from source notes.
No matched photo
A9340-099 · Unit 213 Doors · Open
Install missing door hardware. East bedroom door
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Lower confidence: confirm unit and item; visual detail is ambiguous or nearby items compete for this photo.
P094 · Probable — review A9340-100 · Unit 213 Doors · Needs clarification
Adjust door stop to prevent damage and repair door dent; confirm affected door. Door stop / location unspecified
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P095 · Probable — review A9340-090 · Unit 214 Drywall · Open
Repair gap around outlet and restore finish. Outlet / left of main entry door
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Lower confidence: confirm unit and item; visual detail is ambiguous or nearby items compete for this photo.
P087 · Probable — review A9340-091 · Unit 214 Cabinets · Open
Caulk scribe to wall. Scribe / left of kitchen cabinets
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P088 · Probable — review A9340-092 · Unit 214 Flooring · Open
Repair flooring ding. Sliding door
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Lower confidence: confirm unit and item; visual detail is ambiguous or nearby items compete for this photo.
P089 · Probable — review A9340-093 · Unit 214 Paint · Open
Paint/touch up door edge. Bedroom door edge
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Lower confidence: confirm unit and item; visual detail is ambiguous or nearby items compete for this photo.
P090 · Probable — review A9340-032 · Unit 301 Cabinets · Open
Touch up damaged finish inside bathroom cabinet. Bathroom cabinet / interior
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P034 · Probable — review A9340-033 · Unit 301 Drywall · Needs clarification
Repair cracking at joint above base; confirm exact joint from source. Right of bathroom cabinet / base joint
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P035 · Probable — review A9340-034 · Unit 302 Drywall · Open
Remove texture glob and restore wall finish. Bathroom / below towel holder
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P037 · Probable — review A9340-035 · Unit 302 Cabinets · Needs clarification
Confirm defect and required correction at kitchen corner upper cabinet. Kitchen corner upper
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P036 · Probable — review A9340-036 · Unit 302 Cleaning · Open
Clean modem box cover. Modem box cover
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P038 · Probable — review A9340-037 · Unit 302 Cleaning · Open
Remove paint overspray from latch. Laundry door latch
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P039 · Probable — review A9340-038 · Unit 303 Drywall · Open
Repair wall ding and touch up paint. Left of patio door
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P040 · Probable — review A9340-039 · Unit 303 Cleaning · Open
Clean modem box cover. Modem box cover
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
No clear photo identified in supplied album. Item retained from source notes.
No matched photo
A9340-040 · Unit 303 Flooring · Needs clarification
Secure two popping flooring locations; confirm exact locations. Two locations / unspecified
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P041 · Probable — review A9340-041 · Unit 303 Paint · Open
Touch up paint at base right of refrigerator. Base / right of refrigerator
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P042 · Probable — review A9340-042 · Unit 304 Doors · Open
Adjust rubber seal so entry door operates without sticking. Unit entry
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
No clear photo identified in supplied album. Item retained from source notes.
No matched photo
A9340-043 · Unit 304 Paint · Open
Touch up soffit ceiling above upper cabinet. Soffit / right of refrigerator
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P043 · Probable — review A9340-044 · Unit 304 Cabinets · Open
Adjust drawer so it clears countertop. Drawer / right of stove
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P044 · Probable — review A9340-045 · Unit 304 Cleaning · Open
Remove paint overspray from flooring at both locations. Bathroom entrance and behind door
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P045 · Probable — review A9340-027 · Unit 305 Cabinets · Open
Correct gap below end of kitchen cabinet. Kitchen cabinet end / base
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P031 · Probable — review A9340-028 · Unit 305 Cabinets · Open
Adjust corner Lazy Susan cabinet. Lazy Susan / left of dishwasher
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P032 · Probable — review A9340-029 · Unit 305 Cabinets · Open
Secure loose upper cabinet above Lazy Susan. Upper above Lazy Susan
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Lower confidence: confirm unit and item; visual detail is ambiguous or nearby items compete for this photo.
P032 · Probable — review A9340-030 · Unit 305 Flooring · Open
Secure loose flooring right of bedroom PTAC. Bedroom corner / right of PTAC
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P033 · Probable — review A9340-031 · Unit 305 Paint · Open
Touch up wall by fan switch. Bedroom / wall fan switch
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
No clear photo identified in supplied album. Item retained from source notes.
No matched photo
A9340-023 · Unit 306 Cabinets · Needs clarification
Review gap below dishwasher and confirm required correction. Below dishwasher
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P026 · Probable — review A9340-024 · Unit 306 Plumbing · Open
Complete caulk joint between sink and countertop. Sink / countertop
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P027 · Probable — review A9340-025 · Unit 306 Paint · Open
Paint exposed cabinet trim ends. Cabinet trim ends
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P028 · Probable — review A9340-026 · Unit 306 Cleaning · Open
Remove paint overspray from flooring. Bedroom closet toward bathroom
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P029 · Probable — review P030 · Probable — review A9340-118 · Unit 309 Drywall · Open
Remove drywall glob and restore finish. Above sink
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P112 · Probable — review A9340-119 · Unit 309 Drywall · Open
Repair wall ding and touch up paint. Corner / left of laundry
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P113 · Probable — review A9340-120 · Unit 310 Cleaning · Open
Remove paint overspray. Bathroom / left side
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P114 · Probable — review A9340-121 · Unit 310 Plumbing · Needs clarification
Complete/correct caulking at wall penetration; confirm penetration detail. Water heater / wall penetration
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P115 · Probable — review A9340-122 · Unit 310 Cleaning · Open
Remove paint overspray. Bedroom / left of PTAC
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P116 · Probable — review A9340-123 · Unit 310 Cleaning · Open
Remove paint overspray. Outside bathroom door
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P117 · Probable — review A9340-124 · Unit 311 Cabinets · Open
Correct gap below cabinets. Cabinet base / right side
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P118 · Probable — review A9340-125 · Unit 311 Trim · Open
Install missing base trim. Left of entry door
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P119 · Probable — review A9340-126 · Unit 311 Plumbing · Needs clarification
Secure sink and confirm whether different sink matches approved selection. Sink
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P120 · Probable — review A9340-127 · Unit 311 Cleaning · Open
Remove paint overspray. Bedroom / right side
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P121 · Probable — review A9340-128 · Unit 311 Doors · Open
Complete door replacement underway and verify operation. Laundry / right side
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P122 · Probable — review A9340-129 · Unit 312 Drywall · Open
Repair wall ding and touch up paint. Behind sink faucet
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P123 · Probable — review A9340-130 · Unit 312 Flooring · Open
Close flooring gap. Refrigerator panel
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P124 · Probable — review A9340-131 · Unit 312 Cabinets · Open
Adjust upper corner cabinet hinge. Upper Lazy Susan hinge
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P125 · Probable — review A9340-132 · Unit 312 Cleaning · Open
Remove paint overspray. Bedroom / right of window
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P126 · Probable — review A9340-133 · Unit 312 Cleaning · Open
Remove paint overspray. Bedroom closet
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P127 · Probable — review A9340-134 · Unit 312 Electrical · Open
Remove paint from PTAC plug using appropriate method; verify condition. PTAC plug
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P128 · Probable — review A9340-135 · Unit 312 Paint · Open
Touch up paint at both locations. Bathroom door and above toilet
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P129 · Probable — review P130 · Probable — review A9340-136 · Unit 313 Trim · Open
Caulk and clean up base. Right of tub
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P131 · Probable — review A9340-137 · Unit 313 Doors · Needs clarification
Clean up/restore door edge; confirm specific defect. Laundry door edge
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P132 · Probable — review A9340-138 · Unit 314 Trim · Open
Correct base caulking. Right of refrigerator panel
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P133 · Probable — review A9340-139 · Unit 314 Cleaning · Open
Remove paint overspray. Floor at base / left of main entry
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P134 · Probable — review A9340-140 · Unit 314 Cleaning · Open
Clean cover. Internet box cover
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
No clear photo identified in supplied album. Item retained from source notes.
No matched photo
A9340-141 · Unit 314 Drywall · Open
Repair minor drywall gap and touch up paint. Left of electrical box
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Visual subject and capture order align; unit assignment inferred from draft order. Confirm before issue.
P135 · Probable — review A9340-142 · Unit General Windows · Open
Install remaining screens at completion. Window and door screens
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
No clear photo identified in supplied album. Item retained from source notes.
No matched photo
A9340-143 · Unit General Windows · Needs clarification
Confirm whether required window stops/restrictors are installed. Window stops
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
No clear photo identified in supplied album. Item retained from source notes.
No matched photo
A9340-144 · Unit General Cleaning · Open
Complete final cleaning. East and south wings
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
No clear photo identified in supplied album. Item retained from source notes.
No matched photo
A9340-145 · Unit General Design / scope · Needs clarification
Confirm backsplash requirement and finish behind stove. Wall behind stove
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
No clear photo identified in supplied album. Item retained from source notes.
No matched photo
A9340-146 · Unit General Trim · Needs clarification
Confirm intended detail and whether caulking is required. Base-to-floor joint
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
No clear photo identified in supplied album. Item retained from source notes.
No matched photo
A9340-147 · Unit General Doors · Needs clarification
Confirm which doors must self-close/latch and verify operation. Door latching
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
No clear photo identified in supplied album. Item retained from source notes.
No matched photo
A9340-148 · Unit General Plumbing · Needs clarification
Confirm acceptable trim/sealant detail at drain. Water heater closet drain
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
Lower confidence: confirm unit and item; visual detail is ambiguous or nearby items compete for this photo.
P051 · Probable — review A9340-149 · Unit General Paint · Needs clarification
Confirm whether exposed trim ends require paint. Vanity base trim ends
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
No clear photo identified in supplied album. Item retained from source notes.
No matched photo
A9340-150 · Unit General Plumbing · Needs clarification
Confirm intended tub seal detail and any deficiencies. Tub seals
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
No clear photo identified in supplied album. Item retained from source notes.
No matched photo
A9340-151 · Unit General Electrical · Needs clarification
Confirm approved color temperatures and correct inconsistent installation. Lighting / units
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
No clear photo identified in supplied album. Item retained from source notes.
No matched photo
A9340-152 · Unit General Cost / scope · Needs clarification
Confirm reported $600-per-fixture cost and basis; commercial question. Corridor light fixtures
Created: 2026-10-05 · Due: — · Completed: — · Verified: — · Priority: Normal
No clear photo identified in supplied album. Item retained from source notes.
No matched photo